PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

1st course of block at Corridor 149 Facing East.jpg 3rd floor metal furring at Stair -4 shear wall facing North.jpg Closing up walls at 1st floor sprinkler rooms Facing South.jpg Curtain wall framing at the 2nd floor South Elevation.jpg Installed electrical panel board at the 2nd floor Room 221 Facing North.jpg Installed temporary tarps at the 1st floor Facing South.jpg Installing sanitary-waster piping at bathrooms 242-243 Facing South.jpg Metal Furring at the 2nd floor Shear wall Elev. 1,2,3 Facing East.jpg
Previous pageNext page Curtain wall framing at the 2nd floor South Elevation
Curtain wall framing at the 2nd floor South Elevation